City of Greenville, NC
 
 
 
 
 
 
 
    

A project such as the Tenth Street Connector requires a great deal of coordination and technical analysis. The following schedule shows the tentative dates (subject to change) for the project’s deliverables and milestones:

10 St. Connector - Rendering

2008

bullet-4 Grade Separation Study (Sept)

 

bullet-4 Draft Preliminary Designs (Nov)

 

2009

bullet-4Citizens Informational Workshop (Apr)

 

bullet-4 Draft Environmental Assessment (Aug)

 

2010

bullet-4 Final Environmental Assessment (Jan)

 

bullet-4Citizens Informational Workshop (Mar)

 

bullet-4Citizens Advisory Committee Meeting (June)

 

bullet-4Citizens Advisory/Steering Committee Meeting (Aug)

 

 bullet-4 NCDOT Public Hearing 
     (Tuesday, November 16, 2010)
     Pre-Hearing Open House 4:30pm - 6:30pm
     Combined Public Hearing 7:00pm
     Ronald G. Michels Center (2nd Floor)
     2335 Hemby Lane
     Greenville, NC  27834
     Contact: Jackie Britt (252) 717-2180

 

2011

bullet-4 Citizens Advisory Committee Meeting (Dec)

 

 

2012

bullet-4 Field Inspection of Plans (Jan)

bullet-4 Design to NCDOT Right of Way Office (May)

bullet-4 Right of Way Office completes work plan and begins
making contact
(June)
Estimated time to complete right of way acquisition is 2 years

 

 

 

 

2013

bullet-4Utility Relocation Work Begins (Oct)

 

2014

bullet-4 Bid Opening (Dec)

 

 


Last Modified: 1/24/2014
 
City's Official YouTube Site City's Official Flickr Site City's Alert Twitter Site City's Official Twitter Site City's Official Facebook Site